论文部分内容阅读
标志着我国坝工建设的重大进展,国家工业性试验项目及我国第一座碾压混凝土坝——福建大田坑口坝,最近已胜利建成。坑口坝坝高56.8m,坝顶长122.5m,坝体混凝土方量为6×10~4m~3,其中碾压混凝土方量4.2×10~4m~3。主体工程碾压混凝土施工仅用六个月。1986年7月,水电部科技司和福建省水电厅在北京组织汇报会。承担该工程设计、试验研究和施工的福建省水电设计院、水科所和工程局以及主要协作单位武汉水电学院、水电部杭机所和陕西机械学院等代表向国家计委、国家科委、水电部和水总领导汇报该工程建设和工业性试验情况,得到与会领导和代表的充分肯定,并拟定九月在福建大田召开鉴定验收大会。
Marking the significant progress of dam construction in China. The national industrial pilot project and the first RCC dam in Fujian Province, Daejeon Hang Hau Dam, have recently been successfully completed. The height of Hang Hau dam is 56.8m, the top of dam is 122.5m, the concrete mass of dam body is 6 × 10 ~ 4m ~ 3, of which, the square meter of roller compacted concrete is 4.2 × 10 ~ 4m ~ 3. The main project RCC construction only six months. In July 1986, the Ministry of Science and Technology of the Ministry of Water Resources and the Hydropower Department of Fujian Province organized a briefing in Beijing. Fujian Hydropower Design Institute, Water Science Institute and Engineering Bureau and major cooperating units such as Wuhan Hydropower College, Hangcha Institute of MOHURD and Shaanxi Institute of Machinery undertook the project design, experimental research and construction, and other representatives to the State Planning Commission, the State Science and Technology Commission, The Ministry of Water Resources and Water and the general leadership of water reported the construction of the project and the industrial experiments. They were fully affirmed by leaders and representatives attending the meeting and proposed to hold an appraisal meeting in Daejeon, Fujian Province in September.