焦作城区段是南水北调中线工程总干渠黄河北~漳河南的组成部分,也是南水北调中线工程唯一横穿城市市区的渠段,本段共涉及焦作1段和焦作2段两个设计单元,全部为半填半挖和全填方渠段,渠堤最大填高13m,渠道设计水位高出周围地面,且总干渠流量规模大,两节制闸之间储水量多,渠道两侧均为城市居民和厂矿企业密集区。为确保本段高填方渠道的安全运行,消除可能存在渗漏隐患,采用了塑性混凝土防渗墙加固措施。
The section of Jiaozuo City is an integral part of the main north-south route of the South-to-North Water Diversion Project from the north to the south of Zhangnan and from the only section of the mid-route of the South-to-North Water Diversion Project that runs across the urban area. This section involves two design units, namely Jiaozuo Section 1 and Jiaozuo Section 2, Half fill and half fill and full fill of the canal, the largest embankment embankment filled 13m, the channel design level above the surrounding ground, and the main trunk flow of large-scale, between the two gates of the water storage capacity, both sides of the channel are urban residents and Dense factories and mines. In order to ensure the safe operation of high-fill channels in this section and eliminate potential leakage risks, the plastic concrete cutoff wall reinforcement measures were adopted.