(2013年度上海市优秀工程设计二等奖)该工程是横沙东滩促淤圈围工程总体方案分期实施的一部分,工程位于已建成的横沙二期东侧,新建、加高促淤堤总长16.40km,促淤面积2.26万亩。本工程自开工至保修期结束约两年半时间,围区内淤积土方平均厚度达到1.4m,促淤土方约2072万m~3,既减轻了圈围成陆对土方资源的需求,
(2013 Shanghai Excellent Engineering Design Second Prize) This project is part of the implementation of the general plan of promoting sedimentation and sedimentation in Hengsha East Beach. The project is located on the east side of the completed second phase of Hengsha. The total length of 16.40km, promoting silt area 22600 mus. Since the project was started to the end of the warranty period of about two and a half years, the average silt mound area within the area reached an average thickness of 1.4m, promoting silt about 20,720,000 m 3, both to reduce the circle of land into the earth’s resources on demand,