论文部分内容阅读
目的:探讨新建大型公立医院超声影像诊疗中心的规划与筹建,更合理地优化整合医疗资源,从而最大程度地提高超声影像中心的空间及设备利用率。方法:针对医院医学超声影像诊疗中心系统性建设中的实际情况,提出一套与其相适应的整体规划方案。结果:经过对超声影像中心全面系统性的规划与筹建,完全能够满足大型公立医院超声影像诊疗中心一次性集中建设的需求。结论:经过筹建前期的充分论证、周密规划与筹备以及各方专业人员大力协作,现代化大型公立医院超声影像诊疗中心的一次性集中建设方案是完全可行的。
OBJECTIVE: To explore the planning and preparation of an ultrasound imaging clinic in a newly built large-scale public hospital to optimize and integrate medical resources more reasonably so as to maximize the space and equipment utilization of the ultrasound imaging center. Methods: According to the actual situation in the systematic construction of hospital medical ultrasonic imaging clinic, a set of overall planning plan was put forward. Results: After the comprehensive and systematic planning and preparation of the ultrasound imaging center, it can completely meet the needs of one-time centralized construction of the ultrasound imaging center in large-scale public hospitals. CONCLUSION: After a sufficient period of pre-preparation, thorough planning and preparation, and vigorous collaboration among professionals from all walks of life, it is entirely feasible to modernize the one-time centralized construction of ultrasound medical centers in public hospitals.