当前,能源短缺,用电紧张。多搞水电,充分利用水能资源,发挥水电站的作用,已引起普遍重视。合理地选择水电站的装机容量,乃是充分利用水能资源的关键。多年来,水电建设经验说明,装机容量在水电站建设过程中,常常是一变再变,变化的原因,主要是没有按照技术经济规律办事。因此,加强水电站装机容量选择的经济计算与分析是当务之急。文中强调和介绍了选择装机容量时应遵循的准则。文中还简要地概括了选择装机容量的常用方法,并指出了这一方法存在的主要问题;同时,提出了用动态负荷水平为前提,进行逐年电力平衡,算出电力系统逐年计算支出(计入投资积压)和辅之以综合分析确定装机容量的方法。
At present, the energy shortage, electricity tension. More hydropower, make full use of hydropower resources, to play the role of hydropower stations, has attracted widespread attention. Reasonable choice of hydropower installed capacity, but it is the key to make full use of hydropower resources. Over the years, hydropower construction experience shows that installed capacity in the hydropower station construction process, often changing, changing, the main reason is not in accordance with the technical and economic laws. Therefore, to strengthen the hydropower station installed capacity of economic calculation and analysis is the top priority. The paper emphasizes and introduces the guidelines to be followed when choosing installed capacity. The paper also briefly summarizes the common methods of choosing installed capacity, and points out the main problems of this method. At the same time, it puts forward that using the dynamic load level as a prerequisite, the annual power balance should be calculated and the annual expenditure of the power system should be calculated Backlog) and supplemented by a comprehensive analysis to determine the installed capacity.