论文部分内容阅读
以礼河水电站是我国正在建设中的跨河流开发的高水头梯级电站。位于云南东北部,四个梯级总装机容量32.2万瓩。从1958年8月二级电站发电起,其余各级将在第二个五年计划内陆续投入运转,供给滇东北有色金属矿区及昆明等工业城市用电。以礼河是金沙江的一条支流,全长122公里,河道大部蜿蜒山间两岸壁立。从中游水槽子峡谷以下,河
Lihe Hydropower Station is a high-head cascade hydropower station under construction in China. Located in northeastern Yunnan, the four rungs have a total installed capacity of 322,000 瓩. Since August 1958, the second-level power station has been generating electricity. The remaining levels will be gradually put into operation in the second five-year plan and will be supplied to the non-ferrous metal mining areas in northeast Yunnan and Kunming and other industrial cities. The ceremony River is a tributary of the Jinsha River, a total length of 122 km, most of the winding river winding mountain sides. From the middle of the sink gutter valley, river