根据煤炭部有关规定,当前井巷工程施工组织设计分为单项工程施工组织设计;单项工程年度施工组织设计;单位工程施工组织设计;施工技术措施(巷道作业规程)四种。每一种都有各自的具体内容。这里仅介绍单位工程施工组织设计的编制。 所谓单位工程,一般是指不能独立发挥能力(或效益)、但具有独立施工条件的工程,它是单项工程的组成部分。凡工程结构比较复杂,工程量较大,工期较长或须采用特殊施工法施工的主要单位工程,如立井井筒、斜井井筒、井筒延深、平硐、较复杂的硐室及采用特殊施工法的其它工程等,在施工前都应编制单位工程施工组织设计。
According to the relevant provisions of the Ministry of Coal, the current well construction engineering design is divided into single project construction design; single project annual construction organization design; unit construction construction design; construction technical measures (roadway operating procedures) four. Each has its own specific content. Here only introduces the unit construction construction design organization. The so-called unit project, generally refers to the ability (or benefit) can not independently, but with independent construction conditions of the project, which is an integral part of a single project. Where the engineering structure is more complex, large quantities, long construction period or the need to use special construction method of major construction units, such as vertical shaft, inclined shaft, shaft deep, adit, more complex chamber and the use of special construction Act of other projects, etc., before construction should be prepared unit construction construction design.