住建部印发的《建筑工程五方责任主体项目责任人质量终身责任制追究暂行办法》和《工程质量治理两年行动方案》(以下简称“方案”),把建设、勘察、设计、施工和监理五方主体项目负责人纳入了责任追究体系。“方案”一经媒体发布,很快在建筑工程行业产生了非同一般的反响:把勘察、设计列入责任追究范围,犹如勒住了勘察这根缰绳,把握住了长期被人们忽视了的攸关工程质量的这把“达摩克利斯之剑”。长期以来,只要谈起工程质量和追究工程质量
Interim Measures for Investigating the Quality of Responsible Person Responsible for Five-party Responsible Project of Construction Project issued by Ministry of Housing and Urban-Rural Development and “Two-year Action Plan for Project Quality Control” (hereinafter referred to as the “Plan”), the construction, survey, design and construction And supervision of the five main project leader into accountability system. “Program ” Once released by the media, and soon in the construction industry has had a very unusual response: the investigation, design included in the scope of accountability, as if reined in the investigation of this reins, to grasp the long been neglected The quality of this “” sword of Damocles ". For a long time, just talk about the quality of the project and investigate the quality of the project