华电莱州发电有限公司成立于2010年,由华电国际公司与山东省国际信托有限公司合资建设,是集团公司首家以百万机组起步的大型发电企业。火电一期工程总投资74.2亿元,于2010年3月20日全面开工建设,两台机组分别于2012年11月和12月投产发电。二期2×1000MW工程已列入山东省“十二五”能源发展规划。莱州公司高度重视环保工作,为保证环保设施实现三同时的目标,工程开工前公司就制
Huadian Laizhou Power Generation Co., Ltd. was established in 2010 by a joint venture of Huadian Power International Corporation and Shandong International Trust Co., Ltd. It is the first large-scale power generation company to start with a million units in the group company. The first phase of the thermal power project with a total investment of 7.42 billion yuan was started on March 20, 2010 in full swing. The two units were put into operation in November and December 2012 respectively. Two 2 × 1000MW project has been included in Shandong Province, “Twelve-Five” energy development plan. Laizhou company attaches great importance to environmental protection work, in order to ensure that environmental protection facilities to achieve the three simultaneous goals before the start of the project on the system