FIDIC合同索赔时效及其影响

来源 :国际工程与劳务 | 被引量 : 0次 | 上传用户:zikao0606
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
在使用FIDIC合同1999版、2005、2006和2010版的情况下,(监理)工程师和业主均将28天视为承包商索赔的索赔时效,并要求承包商出示证明28天提出书面索赔通知的证据,用以证明承包商在28天内发出书面索赔通知,从而有权索赔工期延长和/或额外费用。中国承包商错失索赔时效的主要原因超过索赔通知时间造成承包商丧失索赔权利的现象普遍存在于中国企业中。经分析,其主要原因在于以下几点。 In the case of the 1999, 2005, 2006 and 2010 FIDIC contracts, both the Engineer and the proprietor consider the 28 days as a limitation of time for the contractor’s claim and require the contractor to produce evidence of a written notice of claim for 28 days To prove that the contractor issues a written notice of claim within 28 days, thereby being entitled to claim an extension of the period and / or additional costs. The main reason for the Chinese contractors ’failure to claim the limitation of validity is that the contractors’ right to claim losses over the claims notice period is widespread in Chinese enterprises. After analysis, the main reason is that the following points.
其他文献
请下载后查看,本文暂不支持在线获取查看简介。全球首名直立式100米“短跑”飞人诞生 16位大中华顶尖好手发挥“没有不可能”精神竞夺殊荣 Please download to view, this a
期刊
2007年6月26日,杭州湾跨海大桥的南航道桥上,随着建设者将最后一个钢箱梁焊接完成,当今世界最长的跨海大桥——杭州湾跨海大桥胜利合龙、全线贯通。中共中央政治局委员、国务
1999年第8期《行政与人事》中有一篇《鲜花盛开的日子》,里面有一句:“一场无情的强台风突袭上海,使30多个花棚内的花卉于一夜之间毁于一旦。”其中“于一夜之间毁于一旦”
由南京电视台制作的《冬冬和“外星人”》是一部格调清新、启人思索的优秀的儿童电视剧。这个剧描写的是一个父母离异的孩子,当母亲再婚后,与继父由排斥、对立、疏远到逐步
左边是树,右边也是树。森林里有一条小路,曲曲弯弯,弯弯曲曲.一直通向神秘的远方。帕特里克·克鲁伊维特手持猎枪走在小路上,那探头缩脑的样子颇像鬼子进村。一只野兔成了他的射击
NPC—Ⅰ 锈蚀快速转化剂 随着建筑市场的进一步开放搞活,公平的竞争显得更加的必要和激烈,依靠科技的作用,利用高新技术、高新技术产品,使之强化企业管理,挖掘企业潜力,从而
1987年冬,笔者与各地邮友商议关于筹建“风景戳实寄网”事宜,得到同好的赞同和支持,随后在《集邮》杂志上刊发广告。后经邮友建议,改称为“风景戳协会”,并于1988年5月1日在
在子代测定的基础上筛选出优良单亲家系进行中试造林,探讨了各家系相互间在有无竞争的条件下其生长量的差异。在家系间相互存在竞争的情况下,10年生国产湿地松单亲家系比对照(进口
机床,素有“机械工业的心脏”之称,机床工业的发展,标志着金属切削加工技术的进步。 能够向前向后进退动作的木质杆式车床是由弓钻演变而来。弓钻是一种把皮带缠绕在钻杆上,
林业部1995年5月制定了《中国21世纪议程林业行动计划》,要求“建立起比较完备的林业生态体系和比较发达的林业产业体系。建立现代化林业管理体系和社会化服务体系。”林业