我们在大同污水处理厂污泥浓缩池施工中采用了无粘结预应力混凝土施工工艺,其施工要点如下。该工程池壁高4.6m,池壁厚为250mm,混凝土强度等级为 C40,该工程池壁设计除配置非预应力钢筋外,另设10环无粘结预应力钢
We have used unbonded prestressed concrete construction technology in Datong sewage treatment plant sludge concentration pond construction, the construction points are as follows. The project pool wall height 4.6m, the pool wall thickness of 250mm, concrete strength grade C40, in addition to the project pool wall configuration non-prestressed steel, the other 10-ring bond prestressed steel