论文部分内容阅读
根据1993年6月5日板桥水库复建工程验收遗留问题处理专题会议纪要的要求,1993年12月8日至10日淮河水利委员会在河南省驻马店市主持召开了板桥水库混凝土坝渗漏处理会议,参加会议的单位有:水利部建设司、水管司、规划设计总院、咨询中心、河南省水利厅、天津勘测设计院、葛州坝工程局、驻马店地区水利局、驻马店地区板桥水库管理局。与会的各位领导、专家听取了板桥水库管理局关于混凝土坝渗漏观测情况的汇报,听取了天津勘测设计院、葛州坝工程局分别作的渗漏原因分析及渗漏处理建议方案的汇报。通过现场察看、查阅资料、认真讨论、分析研究,取得了一致的意见,现纪要如下:
According to the requirements of the minutes of the special meeting for the treatment of remaining issues of the Banqiao Reservoir Reconstruction Project on June 5, 1993, the Huaihe River Water Conservancy Commission held a lecture on the leakage of the concrete dam of Banqiao Reservoir in Zhumadian City, Henan Province, from December 8 to December 10, 1993 Dealing with the meeting, attend the meeting units are: Ministry of Water Resources Construction Division, Water Management Division, Planning and Design Institute, Consulting Center, Henan Province Department of Water Resources, Tianjin Survey and Design Institute, Gezhouba Engineering Bureau, Zhumadian District Water Conservancy Bureau, Zhumadian District Banqiao Reservoir Authority. Leaders and experts attending the meeting listened to the report of Banqiao Reservoir Administration on the leakage observation of concrete dams and listened to the report on the causes of seepage and suggestions on leakage treatment of Tianjin Survey and Design Institute and Gezhouba Engineering Bureau respectively . Through on-site inspection, access to information, serious discussion, analysis and research, and obtained unanimous opinions, the present minutes are as follows: