甘肃一项工程,一些关键地段是国际招标的,因中方对合同条款抠得不细,在30A遂洞工程承包中发生了“圆周率取位”官司。对计算工程量必不可少的圆周率的取位,中方认为在小数点后取两位是坚持的一般常识,故没有在合同上注明,而意大利承包商则一直取到小数点后第13位。这场“官司”的结果,意方坚持凡是合同上没有明确规定的就可不执行,执法部门仲裁时不得不向意方
In some projects in Gansu, some key sections are internationally tendered. Because the Chinese party did not draw attention to the terms of the contract, a “pi-bit rate” lawsuit occurred in the contracting of the 30A cave project. For the calculation of the amount of engineering necessary to take the pi, China believes that taking two digits after the decimal point is a general common sense, it is not specified in the contract, while the Italian contractor has been to 13th place after the decimal point. As a result of this “litigation,” the Italian side insists that if it is not clearly stipulated in the contract, it may not be enforced. When the law enforcement agencies arbitrate, they have to petition the Italian side.