论文部分内容阅读
对甘肃八盘峡水电厂高低压空压机控制系统进行了改造,介绍了高低压气系统的设计原则及系统的结构、硬件配置、功能和特点。实际运行证明,该系统规划和设计合理,满足水电站日常运行需要。
The control system of the high and low pressure air compressor in the BameiXiaxia hydropower plant in Gansu was reformed. The design principle of the high and low pressure gas system and the structure, hardware configuration, functions and features of the system were introduced. The actual operation proved that the system planning and design is reasonable to meet the daily operation needs of hydropower stations.