端部嵌固桩的计算长度

来源 :铁路标准设计通讯 | 被引量 : 0次 | 上传用户:slksm
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
由于用m法计算桥梁桩基比过去的K法接近实际,所以获得迅速推广和日趋完善,并在矿井工程中亦开始应用。《铁路标准设计通讯》73年第1期“关于桥梁基础采用m法计算土壤弹性抗力的几个问题”(以下简称“几个问题”)一文中对桩基的纵向稳定做了初次分析。本文用能量法讨论嵌固桩的计算长度,所得公式介绍如下。设桩尖固定在岩石内,桩顶有轴向力N、弯矩M和水平力Q作用(见下图)。由弹性稳 Because the m method is used to calculate the bridge pile foundation than the past K method is close to reality, so it has been rapidly popularized and matured day by day, and also started to be applied in mine engineering. The longitudinal analysis of the longitudinal stability of pile foundations was first analyzed in “Railway Standard Design and Communication” No.173 of “Several Problems on Calculating Soil Elastic Resilience of Bridge Foundation by Means” (hereinafter referred to as “Several Problems”). In this paper, we discuss the calculation of the length of the embedded pile by the energy method, the formula is as follows. Set the tip of the pile fixed in the rock, pile axial force N, bending moment M and horizontal force Q (see below). Stable by flexibility
其他文献
本文使用PREM模型与三维地球模型模型分别计算,其中三维地球模型中地壳部分采用Crust1.0模型,由S16B30模型和P16B30模型计算地慢模型。二者计算结果在近场有比较大的差异,在远场
会议
根据国家有关声明的发布,国家倡导以人为本,坚持贯彻落实深化教育改革,将学生作为课堂的主题为根本任务.国家近阶段发布中国学生发展初中地理课堂教学生活化的总体框架,基本
为了研究西太平洋板块俯冲对扬子克拉通MTZ低速层结构的影响特征,本文分别基于中国地震观测台网记录到的震中距为10°-23°之间缅甸弧俯冲区的三个中深源地震和两个浅源地震的
会议
本文采用2年(2009-1010近700个远震事件(Mw>5.0)对中下扬子及周边地区121个台站作P波远震接收函数分析,获取了台站下方的地壳厚度,并结合Heeta1.(2013)和Wang et a1.(2014)的结果
会议
古诗词是我国的传统文化瑰宝,它的意味深长,内容丰富多彩,用词简单明了,语言委婉耐人寻味.因此,教师在进行各学段小学古诗词教学设计时,要对不同学段的学生制定不同的标准,要
近年来,我们常听到这样一些提法:儒学本来具有天理—人欲的内在紧张,因而韦伯的儒学缺乏精神紧张的说法是站不住脚的。对此,反对者径斥之为“新儒家的一厢情愿”,而赞成者也
音乐教育是国家教育体系中的重要构成部分,尤其是在素质教育过程中,音乐教育让年轻一代积累了深厚的艺术文化底蕴.在现代音乐教育改革发展进程中,积极融入民族音乐,可以对音
瀑布沟水库处于青藏高原与四川盆地的过渡地带,位于龙门山、鲜水河和安宁河三大断裂带交汇区域,库区周围存在多条活动断裂。数字台网显示白2006年10月至2013年7月已有4344个小
会议
体态律动教学法作为幼儿园音乐教育中比较重要的一种方法,转变了传统教育中的不足,不仅让幼儿通过律动感受到了音乐,同时也激发了幼儿学习的积极性.因此在幼儿园音乐教育中,
本文以层析成像等地震学研究及GPS等空间大地测量观测结果为约束,结合高温高压实验测试分析得到的岩石物性参数,建立合理的板块俯冲动力学模型,通过数值模拟从时空多尺度角度探