论文部分内容阅读
斜拉桥施工过程中存在施工误差和各种环境影响 ,这些误差将直接关系到斜拉桥的内力和主梁线型。如何在施工过程中减小甚至消除这些误差影响 ,是施工控制所要研究的问题。本文从多座斜拉桥施工控制的结果 ,分析存在各种误差的原因和减少误差的方法
There are construction errors and various environmental impacts during the construction of cable-stayed bridges. These errors will be directly related to the internal forces of the cable-stayed bridges and the main beam line patterns. How to reduce or even eliminate the influence of these errors during the construction process is a problem to be studied in construction control. This article from a number of cable-stayed bridge construction control results, analysis of the reasons for the existence of various errors and reduce the error method