布尔台煤矿42103回风顺槽为一矩形巷道,掘进宽度5.4m、掘进高度3.8m,受上覆22煤的22102、22103两工作面及临近的42102工作面多次动压及煤柱综合影响,两帮臌帮严重处1.5-2.0m,底臌0.3-1.4m。采取锚杆、锚索、注浆联合补强技术处理后,巷道变形基本稳定,能够保证42103工作面的正常开采使用。修复经验表明:足够的支护强度、科学的采掘顺序、合理的巷道布置、适当的煤柱宽度设置、矿压的实时观测是大断面煤巷变形控制的重要影响因素。
Bo Er Tai Coal Mine 42103 return airway is a rectangular roadway, driving width of 5.4m, heading height of 3.8m, covered by 22 22,222,222 2222 coalface and the adjacent 42102 face a number of dynamic pressure and coal pillars comprehensive impact , Two gang help gang seriously 1.5-2.0m, bottom 臌 0.3-1.4m. Take bolt, anchor cable, grouting joint reinforcement technology, roadway deformation is basically stable, to ensure the normal mining 42103 face use. The repairing experience shows that sufficient support strength, scientific excavation sequence, reasonable roadway layout, appropriate pillar width setting and mine pressure real-time observation are important influencing factors for deformation control of large section coal roadway.