论文部分内容阅读
本文从穿黄隧洞施工方的角度,结合现场施工经验,对管片错台及碎裂的原因进行分析,并总结出相关的控制措施,以确保整个穿黄隧洞的管片拼装质量,使整个穿黄工程能够顺利竣工。
Based on the experience of on-site construction, this paper analyzes the causes of the fault and the fragmentation of the pipe segments and summarizes the related control measures to ensure the assembly quality of the pipe segments throughout the Yellow River tunnel, so that the whole Huang project can be successfully completed.