论文部分内容阅读
面对突然而至的大幅度降温,大庆油田采油四厂四矿九零三队全队没有出现一口“冻停”井事故,生产运行秩序一切正常,迈出了冬防第一步,为今冬的生产稳定运行奠定了基础。
In the face of a sudden drop in temperature, the No. 4 Team of No. 4 Mine of Daqing Oilfield Fourth Production Plant did not have a “freezing stop” accident and all the normal production and operation orders took the first step in winter prevention. This winter laid the foundation for the stable operation of production.