为积极做好三峡工程的前期准备工作,水电部于1984年7月在杭州召开了《三峡大型专用施工机械设备》可行性研究报告审定会。参加会议的有机械部、城建部、中船公司、水电部有关设计、科研、制造、施工及高等院校等30个单位的专家、教授、专业技术人员共95人。三峡工程规模浩大,施工强度高,必须采用大容量、高效能的机械设备,参数要求达到现有世界水平,研制难度较大、时间紧迫。杭州机械设计研究所根据长江流域规划办公室关于三峡工程的施工方案和三峡重大装备
In order to actively prepare for the preparatory work for the Three Gorges Project, the Ministry of Water Resources held a validation meeting on the feasibility study of “Three Gorges Special Purpose Construction Machinery and Equipment” in Hangzhou in July 1984. There were 95 experts, professors and professional technicians from 30 departments including the Ministry of Machinery, the Ministry of Urban Construction, the CSSC, and the Ministry of Water and Electricity who were involved in the design, research, manufacture, construction and institutions of higher learning. Due to its large scale and high construction intensity, the Three Gorges Project must adopt large-capacity and high-performance mechanical equipment. The requirements of the parameters have reached the existing world standards, making it more difficult and time-consuming to develop. Hangzhou Mechanical Design Institute under the Yangtze River Basin Planning Office on the construction of the Three Gorges Project and the Three Gorges major equipment