论文部分内容阅读
简述了常减压装置进行的5.0Mt/a设备更新改造内容,并对装置改造后的标定结果进行分析,找出装置改造后存在的问题,并提出改进建议。
The contents of the 5.0Mt / a equipment renewal and modification made by the atmospheric and vacuum distillation unit are briefly described. The calibration results after the reconstruction of the unit are analyzed to find out the problems after the unit is reformed and the suggestions for improvement are given.