论文部分内容阅读
景观泵站的年运行时间大约为10 h,但是景观泵站的负荷等级却很高,结合景观泵站的实际运行情况,提出对主接线形式进行改进的一种方案,即通过增加一台小型杆上变压器来减少变压器的空载损耗,从而达到节能的目的。随着人们生活水平的提高,对周围生活环境也提出了更高要求,国内许多城市都依河而建,随着城市骨架越来越大,沿河两岸成了人们休闲的好去处,景观泵站就是以修建一个人工湖面、形成一处水利景观,来满足人民群众日益增长的文化需要而修建的泵站。而根据景观泵站实际的运行情况,泵站的节能设计中,降低损耗就成为
The annual running time of the landscape pumping station is about 10 h, but the load level of the landscape pumping station is very high. Based on the actual operation of the landscape pumping station, a solution is proposed to improve the main wiring mode by adding a small Rod transformer to reduce the transformer no-load loss, so as to achieve energy-saving purposes. With the improvement of people’s living standards, the living environment is also put forward higher requirements. Many cities in China are built along the river. With the increasing urban skeleton, the two sides of the river have become a good place for people to relax. The landscape pump Station is to build an artificial lake, forming a water conservancy landscape, to meet the growing cultural needs of the people and the construction of the pumping station. According to the actual operation of the landscape pump station, pumping station energy-saving design, reducing losses becomes