本钢五号高炉是目前我国炉容两千立方米以上的四座大型高炉之一。一九七一年投产,经过十年的生产实践,于一九八一年七月停炉进行改造性的大修。除炉体和外围工程以外,还要把西渣口改为出铁口(由原来的一个增加到两个),为此需扩大原有的出铁场。出铁场的扩大,迫使高炉除尘器从原有的位置后移六米,也就是使除尘器与高炉的中心距离由三十米延长到三十六米。同时,由于除尘器的后移,使下降管加长了四点五米。
Benxi Iron and Steel No. 5 blast furnace is currently China’s furnace capacity of two thousand cubic meters above one of four large blast furnace. Commissioned in 1981, after ten years of production practice, it underwent a renovation overhaul in July 1981. In addition to the furnace body and the external works, it is also necessary to change the west slag mouth to a taphole (from one to two), so that the original tapping yard should be expanded. The expansion of the iron yard forced the rearrangement of the blast furnace dust collector from its original location by six meters. That is, the distance between the center of the dust collector and the blast furnace was extended from thirty meters to thirty-six meters. At the same time, the drop tube was lengthened by 4.5 meters due to the retreat of the precipitator.