装岩机是矿山生产的关键设备,我矿配置有绳装岩机50余台,几乎全都是70年代投入使用的老设备,经近20余年的使用,目前故障多,经常趴窝影响生产.如全部更新按现价共需170多万元.经我们对其进行分析后认为,装岩机的上下减速机及轮组部分因每年及时维修,现状况较好,如整机报废太可惜,决定结合大修将有绳装岩机改造为性能比较先进的无绳装岩机,同时更换电控箱.
Rock loader is the key equipment for mine production. There are more than 50 rock climbing machines installed in our mine. Almost all of them are old equipments put into use in the 1970s. After nearly 20 years of use, the current failures often affect the production. Such as all the updates at the current price totaling more than 170 million.After our analysis of the analysis, that the rock loader up and down reducer and wheel part due to timely maintenance each year, the current situation is better, such as machine scrapped it’s a pity that the decision Combined with overhaul rope-mounted rock machine into a more advanced performance of cordless rock loader, while replacing the electric control box.