Treating oil wastewater with pulse electro-coagulation flotation technology

来源 :重庆大学学报(英文版) | 被引量 : 0次 | 上传用户:ren_lian
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Pulse electro-coagulation flotation was used to treat oil wastewater of high oil content. Different operational conditions were examined, including current density, reactive time, electrode distance, pH and pole switching time. Orthogonal tests were carried out to identify the optimal operational conditions for this technique. Considering the treatment cost and efficiency together, the optimal operational conditions were an electrode distance of 3.3 cm, pH of 4, current density of 49.38 mA/cm2, reaction time of 15 min and pole switching time of 10 s. The removal efficiency of oil wastewater under normal conditions reached up to 96.21%. The influences of different factors on removal efficiency were in the following decreasing sequence: pH> current density > pole switching time > reactive time > board distance.
其他文献
EPC项目管理模式是现代西方工程项目管理的主流代表,是一种集设计、采购、施工于一体的项目管理模式。在高层建筑和大型工业项目建造中,EPC模式一直以其高速度、低成本的突出优
营销活动是房地产开发中的核心环节,关系房地产企业的生存和发展。在新形势下,房地产企业必须变革营销理念和方式、创新营销策略,才能吸引更多的消费者。体验营销对于房地产市场
我国多数施工企业比较侧重低成本战略,在施工企业利润空间逐步缩小的情况下,既要保证价格竞争力又要保证一定的盈利水平,就必须重视成本管理,使项目达到低成本,高质量,短工期这一最
在改革开放以来的几十年间,我国建筑工程招投标有了很大进步,但由于存在建设体制、市场机制以及招投标实体方的问题,现阶段招投标工作仍旧存在许多问题,阻碍了我国建筑工程事业的
“十二五”时期,随着经济发展步伐的进一步加快土地资源日益短缺,对楼宇经济发展水平将提出更高的要求。目前,全国30多个城市近百个城区将发展楼宇经济作为城市经济发展的核心战
突发事件近年来在世界范围内越来越受关注,尤其是影响到人类自身的突发灾难性事件.我国把突发事件分成了事故灾难、自然灾害、公共卫生事件和公共安全事件等四大类.但是,这四
我国电力体制改革在不断向前推进,那么电力设计施工企业势必要通过改善管理方式、降低施工成本来增强企业的综合实力和市场竞争力。本文结合电力工程项目成本控制内涵和意义,立
在新农村建设的滚滚潮流中,乡风文明建设已经成为一个不可或缺的重要目标。本文从农村乡风文明建设的现状着手,凸显大学生村官在乡风文明建设中的积极贡献和现实困难,力求建
璜山金矿为一小型矿床,区内主要工业矿体为Ⅰ号矿体。文中详细叙述了璜山金矿区Ⅰ号矿体资源地质概况、开发利用技术方案及矿山生态环境治理方案。 Huangshan Gold Mine is