论文部分内容阅读
本文介绍的方法可以适用于40多度倾角的地层偏移,所需计算时间只要克莱鲍特(Claerbout)算法的五分之二.文章的末尾介绍了实际资料处理的例子.
The method described in this paper can be applied to the formation offset of more than 40 degrees and requires only two-fifths of the Clarebout algorithm.