论文部分内容阅读
狮子坪电站装设的3台单机容量65MW的水轮发电机组,是东方电机迄今为止设计制造的水头最高的混流式机组。本文介绍了狮子坪水轮机的基本性能要求和结构特点。
Three stand-alone 65MW hydro-generator units installed by Shiziping Power Station are the highest-flow mixed-flow units ever designed and manufactured by Dongfang Electric. This article describes the basic performance requirements and structural features of the Shiziping turbine.