目前,莱茵兰特矿联合矿两个水平共用的一套皮带运输系统计有主皮带17条(总长16公里),8座原煤仓,10个振动溜槽。它籍助Geamatic2000i型自动化系统监视,并由井上皮带调度室控制。该系统使用了Geatrans21型和GeatransFQM200i型遥控系统和LogistatGoi型逻辑系统。计算机控制设施与这一系统连接,使连接各水平的11号倾斜皮带实现了连续运转,而且,在分配煤仓给煤量变化的情况下,帕特拜克1号井和莱茵普鲁士9号井的提升能力也得到了充分利用。
At present, a set of belt transport systems shared by two levels of the Rhineland Mine is included in the main belt 17 (total length of 16 km), 8 coal bunker, 10 vibration chute. It is aided by the Geamatic 2000i automation system monitoring and controlled by Inoue Belt Dispatch Room. The system uses the Geatrans21 and GeatransFQM200i remote control systems and LogistatGoi logic system. The computerized control facility was connected to this system to allow continuous operation of the No. 11 inclined belt connecting all levels and, with the change in the coal quantity allocated to the coal bunker, the Patbeck well 1 and the Rheinprus 9 well The improvement ability has also been fully utilized.