基建投资的经济合理性浅析

来源 :财会通讯 | 被引量 : 0次 | 上传用户:feya520
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
建设项目是根据它在国民经济中的地位和作用决定进行的,但是必须充分考虑它的技术可能性和经济合理性,以便有计划地筹集资金,避免某些建设项目在施工过程中,中途下马,或投产以后不能保本。一、投资回收期限法投资回收期限法是指在建设项目达到生产能力以后,用产品销售的盈利额抵偿投入的基建投资所用的时间,或用该项目投产后所增长的利润额收回投资所用的时间。公式: The construction project is decided according to its status and role in the national economy, but it must fully consider its technical possibilities and economic rationality in order to raise funds in a planned way and avoid certain construction projects from being discontinued during the construction process. , or can not maintain the cost after the production. First, the investment recovery term method The investment recovery term method refers to the amount of time it takes for the investment in infrastructure investment to be repaid with the profit amount of product sales after the construction project reaches production capacity, or for the return of investment with the increase in profit amount after the project is put into production. time. formula:
其他文献
风水是中国传统建筑文化的重要内容。风水思想的可贵之处是把人看成自然的一部分,认为人与自然同处于一个有机整体,人类居住的建筑空间应与周围环境相互协调。这种大地有机自
本文通过对黄土有关力学性质(压缩性、抗剪强度、湿陷性、静止侧压力系数)试验的分析,指出了试验中的应注意的有关问题,阐述了试验结果的变化规律,分析了黄土力学性质指标间的相互
我场一丰收-3.0型自走式联合收割机在夏收作业中,突然出现下述异常现象:发动机(4115 L_1)中低速运转时,冷却水温正常;高速运转时,出现冷却水温骤然升高甚至开锅的反常现象。
1.转速不稳一台S195柴油机转速不稳。转速缓慢上升,又缓慢下降,反复一次约半分钟,这种现象是在更换新柱塞后发生的。当即拆下高压油泵检查,柱塞球柄活动发滞,以为是柱塞套筒
目次一、SSNIP测试法的妥适性二、在双边市场SSNIP测试的挑战与SSNDQ测试的引入三、竞争者视角的缺陷、消费者利益的缺失与SNNIP的失误四、结语奇虎与腾讯之间的纠葛由来已久
事件回放:某日上午08:00左右,在某造船厂船坞工地,某公司承担安装600t起重量、跨度为170 m的巨型龙门起重机,在吊装主梁过程中发生倒塌,造成36人死亡的特大事故。 Event Rep
目的:观察白内障超声乳化及人工晶体植入术的效果。方法:对70例(72眼)白内障采用新型超声乳化仪,在表面麻醉下行白内障超声乳化人工晶体植入术。观察术中超声乳化能量、超声
安监总管一[2009]92号各省、自治区、直辖市及新疆生产建设兵团安全生产监督管理局:为认真贯彻《国务院办公厅关于进一步推进安全生产“三项行动”的通知》 Safety Supervis
各省、自治区、直辖市血液中心和科研院所:由国际输血大会主办、中国输血协会和广州血液中心共同承办的第28届地区性(非欧洲)国际输血大会定于2017年11月25-28日在广州白云国
梅市交字[2017]126号各县(市、区)人民政府,各有关单位:为规范我市网络预约出租汽车经营服务行为,保障运营安全和乘客合法权益,现将《梅州市网络预约出租汽车经营服务管理实