桁架拱桥整体吊装

来源 :建筑技术 | 被引量 : 0次 | 上传用户:flyliubo
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
山西省机械施工公司于1980年4月初接受了华盛大桥吊装任务。该桥承重构件为斜拉杆式桁架拱,七孔,中孔桥墩中~中26.70米;拱架净跨25.40米,矢高3.175米,拱度为1/8,共七孔。原设计为三段预制,接头部分钢筋电焊后,用250号混凝土浇灌。桁架拱在河滩里就地预制,必须在汛期前(6月中旬)完成吊装。除去构件预制时 Shanxi Mechanical Construction Company accepted the Huasheng Bridge hoisting task in early April 1980. The bridge load-bearing member is a cable-stayed truss arch, seven holes, medium to medium-sized bridge piers - medium 26.70 meters; arch net net span 25.40 meters, vector height 3.175 meters, crown 1/8, a total of seven holes. The original design was a three-stage prefabricated joint. After the joints were partially welded and welded, 250 concrete was used for watering. Truss arches are prefabricated on the river beach and must be hoisted before the flood season (mid-June). When removing prefabricated components
其他文献
一、前言众所周知,比例满应力法是结构优化设计中的一大重要方法,它是从结构力学的原理出发,根据满应力准则,采用“应力比”逐次逼近的过程寻求结构最优解的方法。此法在六
云南省泸水县第一中学地处滇西边疆地区的怒江大峡谷,是典型的边疆民族学校,少数民族学生占全校学生的95%以上。由于山高谷深,自然环境恶劣,群众生活困难,学生的控辍保学工作
《党史文汇》今年第四期刊登的《共产党领导山西新军的历史经验》一文,如实地反映了山西新军的历程以及为保证党对新军的实际领导而对一些旧军官的反动行为进行斗争的真实情
随着社会的发展,网络技术在小学语文教学中的应用越来越广泛,这为小学语文课程的教学注入了新的活力。语文教师在教学的过程中应该利用网络教学的优势,构建网络环境下小学语
巴塞罗那俱乐部(F.C.Barcelona)是世界上最著名的俱乐部之一。1899年,瑞士企业家JoanGamper建立了巴塞罗那队。在该队逾百年的历史上,获得冠军奖杯45个,并且是三支获得过欧洲
随着第二汽车厂生产的EQ140载重汽车的批量生产,起重机厂开始采用该底盘设计并生产8吨液压汽车起重机。为了充分利用该底盘的承载能力,提高8吨汽车吊的技术性能,国家建委建
槽形板在工业与民用建筑中,所占的比例很大.在考虑生产该种构件之前,首要的问题是其钢模的设计及加工.在考虑槽形板钢模构造及细部装配时,必须注意侧邦与底模的装配关系、主
预习是最重要的学习习惯之一,几乎每一个优秀的学生都有良好的预习习惯。预习不只是简单地提前看一看书,它能让学生有目的、更从容地去听课。因为提前知道教师要讲的内容,并已经理解了,听起课来就会轻松许多。此外,预习会让学生获得一种心理上的优势,这种优势会转化成信心。常言道:“从善如登,从恶如崩。”好习惯需要下真功夫。中高年级的课程标准就突现了课前预习的重要性,要求教师着力培养学生的预习习惯。那么,教师如何
广雅中学自1888年建校以来,已有123年历史,经历了风起云涌的二十世纪,积淀了丰厚的历史、物质文化和精神文化。她是中国近现代教育的活化石,也是中国近现代历史的见证者。该
常州市是一个具有三十八万人口的中小工业城市。为缓和城市住房的紧张状况,常州市近年来新建了大批居民住宅。清潭小区是继花园小区落成后开始建造的又一小区。清潭位于常州