论文部分内容阅读
通过对6m3后底卸式矿车却载桥在试生产中出现的复位曲轨与矿车轴干涉和矿车进入轨道时的异常跳动原因的分析研究,较准确地提出了解决这些问题的方法和措施
By analyzing and analyzing the reason of the abnormal beating when the 6m3 rear bottom dump truck is loaded with the bridge during the trial production, the interference between the reset curved rail and the mine shaft and the trolley entering the orbit, the methods for solving these problems are set forth more accurately Measures