论文部分内容阅读
本文所附图1为基督城地震前与地震后的图底分析图,图上显示白色区域多于黑色区域,或者说背景部分远多于图形部分,这表明从2010至2011年地震后的四年中,大量位于基督城商务中心区的楼宇被拆除。图中的背景部分,不论是公共所有还是私人所有,被大量过渡项目所使用,其中包括325项社区活动,以及由150个创意项目使用并增大了450倍的100处空地。本文旨在分析这些项目是如何产生的;在当代城市设计和城市艺术实践方面,这些项目代表了什么;以及在城市重建过
Figure 1 shows the bottom of Christchurch before and after the earthquake analysis of the bottom map shows more white areas than black areas, or the background part is much larger than the graphical part, indicating that from 2010 to 2011 after the earthquake four During the year, a large number of buildings located in Christchurch CBD were removed. The background portion of the figure, whether public or private, was used by a large number of transitional projects, including 325 community activities and 100 open spaces used by 150 creative projects and a 450-fold increase. The purpose of this article is to analyze how these projects have taken place, what these projects represent in contemporary urban design and urban artistic practices, and in urban renewal