北京火车站是一九五九年国庆十大工程之一。它的建造规模宏伟,设备先进,技术复杂,是我国建筑史上一项伟大的创举。铁道部为了把反映这一伟大工程的技术档案整理的系统、完整、准确,决定以北京铁路局为主,由三十二个单位抽调工程技术和有关人员,进行了收集和整理工作,从一九六三年十一月开始,历时达七个月之久。这次整理档案收获很大,主要是收集整理出了一套比较完整、系统、准确的北京站工程档案,重新绘制了一套新竣工图,结合技术档案的核对、鉴定,对整个工程的站场通信信号站舍大楼大桥等基建设备的质量进行
Beijing Railway Station is one of the top ten projects of National Day celebration in 1959. Its magnificent construction scale, advanced equipment and sophisticated technology are a great pioneering work in the history of architecture in our country. In order to complete and accurately analyze the technical archives that reflect this great project, the Ministry of Railways decided to take the Beijing Railway Administration as the mainstay, to collect and sort engineering and related personnel from 32 units, It started in November 1963 and lasted seven months. The collation of the file is a great harvest, mainly collected and compiled a set of more complete, systematic and accurate Beijing Railway Station project files, re-drawn a new completed map, combined with technical files of the check, identification, the entire project of the station Field communication signal station building bridge and other infrastructure quality