在多层框架结构房屋施工中,当外墙砌筑完毕,进行大面积外墙抹灰时,一般需搭设吊篮脚手架施工,在外墙抹灰完毕之前,不能拆除吊篮。这样,其屋面支承设施一直阻挡屋面施工的矛盾就没法解决。兰州市房建二分公司的机修老班长黄守琪制作厂一种活动吊篮车,有了它,在大面积外墙抹灰完毕之后,即可拆除所有吊篮,进行屋面
In the construction of a multi-story frame structure house, when the exterior wall is masonry finished and a large area of external wall plastering is performed, a scaffolding scaffolding is usually erected. Before the external wall is plastered, the hanging basket cannot be removed. In this way, the roof support facilities have always prevented the contradiction of the roof construction from being solved. Huang Shouqi, an old mechanic and supervisor of Lanzhou Fangjian Second Branch, made a kind of activity basket car. With it, he can remove all the hanging baskets after the plastering of the large area of the external wall and carry out roofing.