总投资8.5亿元的焦作至晋城高速公路焦作段,全长17.036公里,由于该工程穿山掠谷,工程沿线山势陡峻,峰峦叠障,地形恶劣,地质复杂变化无常。因此,这个工程除了桥隧相连外,深挖高填路段多,防护工程量大,其主要工程有大中桥24座,隧道12座(其中一座为联拱隧道),土石方391万方,采空区治理2.75公里,涵洞通道53道,浆砌片石排水、防护工程11.6万方,科技含量之高和施工难度之大在河南省高速公路建设史上绝无仅有,在我国也属罕见。
With a total investment of 850 million yuan, Jiaozuo to Jincheng Expressway Jiaozuo, a total length of 17.036 kilometers, due to the project through the mountain swept valley, the project along the steep mountains, mountainous overlapping barrier, poor terrain, complex geological changes. Therefore, in addition to the bridge and tunnel connected to the project, digging more sections of high filling, protection of large quantities of its major projects are 24 large and medium-sized bridges, tunnels 12 (one of the multi-arch tunnel), earth and stone 391 square meters, mining Empty area governance 2.75 kilometers, culverts channel 53, mortar rubble drainage, protection project 116,000 square meters, high technology content and construction of the great difficulty in highway construction in Henan Province history unique in China is also rare.