论文部分内容阅读
渤海工程设计公司自从1965年在渤海安装第一座石油平台以来,至今已成功地设计、制造及安装了近30座平台,积累了丰富的经验,这些平台经受了地震、风浪及冰荷载的考验。正是这些恶劣的海况条件促使我们的设计与安装技术不断前进。最近渤海工程设计公司研制的“导流冲削式深卧基础”、“恒排量下沉法”、“削减海浪结构”以及“分振结构”等,有的已用于工程实际,有的即将付诸实施,它们都有突出的技术经济效益。
Since the installation of the first oil platform in the Bohai Sea in 1965, Bohai Engineering Design Company has so far successfully designed, manufactured and installed nearly 30 platforms and accumulated rich experience, which has withstood the tests of earthquakes, wind waves and ice loads . It is these harsh conditions of the sea that drive our design and installation technology to move forward. Recently, Bohai Engineering and Design Company developed “diversion deep foundation ”, “constant displacement sink ”, “cut the wave structure ” and “sub-vibration structure ” and so on, and some Has been used in engineering practice, and some will be put into practice, they have outstanding technical and economic benefits.