论文部分内容阅读
建筑工程土建施工中的桩基础施工技术
【出 处】
:
建筑工程技术与设计
【发表日期】
:
2017年15期
其他文献
This paper presents the application of the multi-stage first-order centered scheme GMUSTA to solve a two-phase flow model with four equations for simulating dam
在航空运输企业兼并重组过程中,应以人力资源管理和企业文化为导向,逐步导入资产重组,通过输出文化来转移技术力量,通过运用有效的人力资源管理和企业文化聚合形成新的竞争优
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
Petrography of alluvial sands as a past and present environmental indicator: Case of the Loire River
Four sample sets of the Upper and Middle Loire river sands were analyzed in order to study the impact of natural and anthropogenic factors on their petrographic
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
Numerical modeling of tidal currents, sediment transport and morphological evolution in Hangzhou Bay
A 2D depth-averaged numerical model is set up to simulate the macro-scale hydrodynamic characteristics,sediment transport patterns and morphological evolution i