“工地结帐”就是把结算工资工作搬到工地去做,这个办法是公路总局第三工程局四处、四队财务、工务、材料、劳资等单位共同研究提出来的。这个办法又快又好,每收方一结束,工资就可以发下,二至三天内就能把表报送出,不仅大大缩短结束工资工作,而且推动了成本分析和经济活动。具体做法是丈量组走在前面,计算审核组跟上,结帐组捎尾。每月收方的时候,由工人代表、工长、工务、财务、材料、劳资等人员组成“工地结帐”小组。作如下分工: ①丈量组——3人(2个工人代表、1个工长),负责量方,一人记录,二人量。②计算审核组——4人(工务2人、劳资1人、材料1人),工务员负责计算和图表核对,材料员负责材料核对,劳资员负责审核工时、出勤等。 “Construction site checkout” is to settle the wage work to move to the site to do this approach is the Third Engineering Bureau of Highway Administration around the four teams of finance, public works, materials, labor and other units jointly studied and put forward. This method is fast and good. As soon as the income of each party is over, wages can be paid and the reports can be sent in two to three days. This not only greatly shortens the work of ending wages, but also promotes cost analysis and economic activities. The specific measure is to walk in front of the measurement group, audit team to keep up, checkout group take the foot. At the time of collecting the goods each month, a group of workers’ representatives, foreman, public works, finance, materials, labor and capital and other personnel form a “site checkout” group. The following division of labor: ① measurement group - 3 people (2 workers’ representatives, a chief engineer), responsible for the volume side, one record, two people. ② calculation of audit team - 4 (2 public works, labor 1, material 1), the clerk is responsible for the calculation and chart check, material staff is responsible for material checking, laborers responsible for the review of working hours, attendance and so on.
其他文献
期刊
本文针对标准化科研课题论证中的有关情况和标准化文献中标准化对象定义的现状,分析了研究标准化对象概念的意义,探索性地辨析、提出了标准化对象的定义及识别标准化对象的方
请下载后查看,本文暂不支持在线获取查看简介。 Please download to view, this article does not support online access to view profile.
期刊
期刊