优化现场管理逐步实现企业管理整体优化,是机电工业企业面临的一项重要任务。在省、市经委和省机电厅的指导下,太重集团公司结合本企业实际,把“强化管理意识,狠抓生产现场,推进整体优化”做为工厂方针目标的一顶重点工作,认真组织,狠抓落实。管理工作一年上一个新台阶:1988年进入国家二级企业行列;1989年通过国家级安全性评价验收合格;1990年荣获机电部“机械工业企业管理优秀单位”称号;1991年开始优化现场管理,促进了企业整体优化,从而使企业素质不断提高;1992年实现停亏进入全国500家行列;1993年实现利润600余万元居全国九大重机之首。目前,公司18个厂的现场管理有4个厂达到省机电厅规定的二级水平,14个厂达三级水平,获得太原市现场管理优秀企业称号。太重集团公司在厂房陈旧,设备严重老化,企业资金极度困难的情况下,坚持从实际出发,本着不花钱或少花钱也办事的原则,凡是通过加强组织领导和严格制度管理能办到的事先办,凡改善生产现场条件非花钱不可的事,本着自力更生,量力而行,先重点后一般,先局部后整体,分期分批到位的原则逐步来办。全公司上下联动,点
Optimizing on-site management and gradually achieving overall optimization of enterprise management is an important task faced by mechanical and electrical industrial enterprises. Under the guidance of the provincial and municipal economic commissions and the provincial electromechanical department, Taizhong Heavy Industries & Construction Group, in line with the actual conditions of the company, has made “a strong sense of management, a focus on the production site, and promotion of overall optimization” as a key task for the factory’s policy and objectives. , pay close attention to implementation. The management work has reached a new level in one year: In 1988, it entered the ranks of the second-tier national enterprises; in 1989, it passed the national-level safety evaluation and acceptance; in 1990, it was awarded the title of “Excellent Enterprise in Mechanical Industrial Enterprise Management” by the Ministry of Mechanical and Electrical Engineering; in 1991, it optimized the management of the site. It promoted the overall optimization of the enterprise and thus continuously improved the quality of the enterprise. In 1992, it achieved the stop loss and entered the 500 ranks of the country. In 1993, it realized the profit of more than 600 million yuan among the nation’s nine largest heavy machinery. At present, the company’s 18 plants have four on-site management plants that meet the secondary level set by the Provincial Electromechanical Department, and 14 plants have reached the third-level level, and have been awarded the title of Excellent Enterprise in Site Management in Taiyuan City. In the case of obsolete factory buildings, severely aged equipment, and extremely difficult corporate funds, the Taizhong Heavy Industries & Construction Group insists on proceeding from reality and adopts the principle of no cost or less money. All can be done by strengthening organizational leadership and strict institutional management. Beforehand, we must do everything in advance to improve the conditions of the production site. We must follow the principle of self-reliance and measurement. Linkage from company to company, point