论文部分内容阅读
1 水利建设当中存在的主要问题1.1 重数量,轻质量,重复建设与投入造成了大量建设资金和资源浪费,造就了大批低水平运行项目在国家投资项目和农民自发投资项目上都存在着同样的问题。如灌区配套改造一直没有走出“建设——毁坏——改造配套——再毁坏——带病运行”的怪圈,灌区效益面积没有随着配套改造的完成有所增加,相反倒是呈逐年下降趋势,根本原因就是建设标准低,配套改造也没有提高标准而是简单修复,运用管理中不能满足实际需要,甚至影响群众运用。国家投资政策也是造成大量低标准重复建设的一个重
1 The main problems in water conservancy construction 1.1 Heavy quantity, light quality, redundant construction and investment caused a lot of construction funds and waste of resources, resulting in a large number of low-level operation of the project in both national investment projects and farmers spontaneous investment projects are the same problem. Such as supporting the transformation of irrigation has not been out of the “construction - destroy - transform supporting - re - destroy - sick run ” of the circle, the benefit area of irrigated area did not increase with the completion of complementary transformation, but rather declined year by year Trend, the fundamental reason is the low standard of construction, supporting reform did not raise the standard but simply to repair, management can not meet the actual needs, and even affect the use of the masses. The national investment policy is also a heavy cause of a large number of low standards of redundant construction