本文结合地下室剪力墙与顶板混凝土同时浇筑施工实例,对采用以后浇带为分界线分作两个连续施工段的施工技术作探讨,并提出可行的技术措施,为同行提供借鉴。
In this paper, basement shear wall and roof concrete pouring construction example at the same time, after the use of pouring tape as the dividing line for two consecutive construction section for discussion of construction techniques, and put forward feasible technical measures to provide reference for their peers.