Investigation on Flow Accelerated Corrosion Mitigation for Secondary Circuit Piping of the Third Qin

来源 :中国机械工程学报 | 被引量 : 0次 | 上传用户:jj806778025
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Flow accelerated corrosion (FAC) is the main failure cause of the secondary circuit carbon steel piping in nuclear power plants. The piping failures caused by FAC have resulted in numerous unplanned outages and tragic fatalities. The existing researches focus on the main factors contributing to FAC, which include metallurgical factors, environmental factors and hydrodynamic factors. Some effective FAC management methods and programs with long term monitoring and inspection data analysis are recommended. But a comprehensive FAC management system should be developed in order to mitigate and manage FAC systematically. In this paper, the FAC influencing factors are analyzed in combination with the operating conditions of the secondary circuit piping in the Third Qinshan Nuclear Power Plant(TQNPP), China (Third Qinshan Nuclear Power Company Limited, China). A comprehensive FAC mitigation and management system is developed for TQNPP secondary circuit piping. The system is composed of five processes, viz. Materials substitution, water chemical optimization, long-term monitor strategy for the susceptible piping, integrity evaluation of the local thinning defects, and repair or replacement. With the implementation of the five processes, the material of FAC sensitive pipe fittings are modified from carbon steel to stainless steel, N2H4 and NH3 are finally selected as the water chemical regulator of secondary circuit, the secondary circuit pips are classified according to FAC susceptibility in order to conduct long term monitoring strategy, and an integrity evaluation flow for local thinning caused by FAC in carbon steel piping is developed. If the component with local thinning defects is not fit-for-service, corresponding repair or replacement should be conducted. The comprehensive FAC mitigation and management system with five interrelated processes would be a cost-effective method of increasing personnel safety, plant safety and availability.
其他文献
请下载后查看,本文暂不支持在线获取查看简介。 Please download to view, this article does not support online access to view profile.
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
慕课,即大规模在线开放课程的简称,是互联网环境下新兴的教育模式。慕课教育的发展得益于互联网的普及以及开放教育运动的兴起。2001年,美国高校为了适应互联网环境下的学习
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
随着我国各行业在市场经济中的不断发展,行业发展的法制化要求不断加强。行业立法的出现既满足了行业发展的需要,同时又标志着我国的立法工作取得了新的突破。但是作为新的立
2016年11月1日,第11届珠海航展开幕.当天上午10时20分左右,展区上空突然传来巨大的引擎轰鸣声,两架歼-20隐形战机准时抵达展区上空,并默契地做了公开双机飞行,虽然飞行展示只
期刊
目的:探讨不同剂量地西他滨治疗骨髓增生异常综合征(MDS)的临床疗效。方法:地西他滨治疗中高危MDS患者29例,根据患者应用地西他滨剂量的不同,分为8 d方案组(12 mg·m~(-2)·d
大学生素质拓展计划是共青团中央、教育部、全国学联为深入推进高校素质教育整合第二课堂而联合实施的一项系统工程。该项目工程在全国高等院校实施以来,受到各高校的重视与
打瓜机械技术在塔城市的推广示范受到广泛关注,创新技术推广措施,提升打瓜机械化技术的应用质量,增强塔城市打瓜机械技术的应用效果.因此,新疆塔城市农牧业机械化技术推广站