7月6日,国务院以国发(2013)26号文印发了《芦山地震灾后恢复重建总体规划》(以下简称《规划》),《规划》提出:用三年时间完成恢复重建任务,使灾区生产生活条件和经济社会发展得以恢复并超过震前水平,为到2020年与全国同步实现全面建成小康社会目标奠定坚实基础。恢复重建资金总需求约860亿元。《规划》包括前言以及重建基础、总体要求、
On July 6, the State Council issued the overall plan for the reconstruction and reconstruction of the Lushan Earthquake (hereinafter referred to as the “Plan”) with the document No. Guo Fa (2013) No. 26 and proposed in the “Plan” that the task of restoration and reconstruction should be completed in three years so that the affected areas Production, living conditions and economic and social development have recovered and surpassed the level before the earthquake, laying a solid foundation for achieving the goal of building a well-off society in an all-round way by 2020 with the whole country. The total demand for reconstruction and reconstruction funds is about 86 billion yuan. “Planning” includes the preamble and the basis of reconstruction, the general requirements,