论文部分内容阅读
7月8日,中山市首条“水上高速路”——横门东水道疏浚加深工程正式动工。横门东水道介于火炬区北部、民众镇南部之间,是中山市船舶通往珠江口、南海以及香港货运码头的交通咽喉,目前平均水深仅为4.5米。4个月后,航道水深将加深至6.4米,确保3000吨级以下
July 8, Zhongshan City, the first “Water Expressway ” - Hengmen East Waterway dredging deepening project officially started. Crossing the northern part of the Torch District and the southern part of Minzhong Town, the Hengmen East Waterway is the traffic throat of Zhongshan Ship leading to the Pearl River Mouth, the South China Sea and the Hong Kong Ferry Terminal. At present, the average water depth is only 4.5 meters. After 4 months, the water depth will be deepened to 6.4 meters, to ensure that 3,000 tons below