论文部分内容阅读
本文是作者参加吴村煤矿排水系统补套工程设计而写的。由于该矿水文地质复杂,涌水量大,并且原有的排水设施又存在许多不合理之处,既需要利用,又需要改造,故新的排水系统补套工程设计十分复杂、难度较大本文主要阐述在设计中,从实际情况出发,经过大量的现场调查研究和分析工作,并进行了较详尽的技术经济比较,从而确定了较合理的设计方案,此项设计方案已由我院矿山开发设计研究所报请河南省和煤炭部主管部门审查批准,并已开始进行施工设计。本文对地方煤矿排水系统改扩建工程设计,有一定的参考价值。
This article is written by the author who participated in the design of the drainage system of Wucun Coal Mine. Due to the complexity of the hydrogeology and geology of the mine, large inflow of water, and many unreasonable existing drainage facilities, which are both in need of utilization and reconstruction, the design of the new drainage system co-construction project is very complicated and difficult. Elaborated in the design, starting from the actual situation, after a large number of on-site investigation and analysis, and conducted a more detailed technical and economic comparison, so as to determine a more reasonable design, this design has been mine design and development in our hospital The Institute submitted to the competent departments of Henan Province and the Ministry of Coal review and approval, and has begun construction design. This article on the local coal mine drainage system reconstruction project design, have some reference value.