论文部分内容阅读
水利建设工程造价如何防止在建设过程中出现三超现象,是水利建设者们普遍关心的问题,根据治理太湖流域工程建设实践,提出要从合理确定工程建设项目及其规模、重视设计方案和设计标准的选定、弄清工程项目的建设条件、认真核查政策处理部分的工作深度、重视投资估算编制价格上的属地化特性几方面,掌握好工程静态投资估算,做到“量”、“价”科学定位,以有效控制建设项目工程造价。
According to the practice of engineering construction in Taihu Lake Basin, how to prevent construction of water conservancy construction project from three super phenomena is a common concern of water conservancy builders. According to the practice of engineering construction of Taihu Lake basin, it is proposed that from the reasonable determination of project construction scale and its importance to design plan and design Standard selection, make clear the construction conditions of the project, carefully check the depth of the work of the policy processing part, attach importance to investment in the preparation of the localization of the price of several aspects of the character, master the project static investment estimates, so that “Price ” scientific positioning, in order to effectively control the construction project cost.