CFG桩复合地基技术目前已广泛应用于高层建筑地基处理,但实际工程中CFG桩施工问题频发,故引起对其承载力检测方法的关注,相关规范也伴随工程实践和总结逐渐成熟起来。《建筑地基处理技术规范》(JGJ79—2002)只要求进行复合地基静载荷试验以检测复合土层承载力,《建筑地基处理技术规范》(JGJ 79—2012)增加了复合地基增强体单桩静载荷试验,要求必须将增强体单桩承载力作为检测的一项重要指标。本文中某高层办公楼,在新版规范(2012版)未使用之前,超前进行了复合地基增强体单桩静载荷试验,试验结果的确有不合格增强体单桩,即在所检测的5根单桩中,2根单桩承载力未达到设计要求。为此,讨论了在进行CFG桩复合地基设计时,进行增强体单桩静载荷试验的必要性。
CFG pile composite foundation technology has been widely used in high-rise building foundation treatment, but the actual project CFG pile construction frequent, it caused its bearing capacity detection methods attention, the relevant norms also accompanied by engineering practice and summary gradually matured. The JGJ 79-2002 only requires the static load test of composite foundations to test the bearing capacity of composite soils. The Technical Guidelines for Treatment of Building Foundation (JGJ 79-2012) adds the static reinforcement of composite piles The load test requires that the bearing capacity of a single pile of reinforced body must be taken as an important index for testing. In this paper, a high-rise office building, in the new version of the standard (2012 version) before the unused, ahead of the composite foundation to enhance the body single pile static load test, the test results do have failed to enhance the body single pile, that is detected in 5 single Pile, two single pile bearing capacity did not meet the design requirements. For this reason, the necessity of enhancing static load test of single pile in CFG pile composite foundation is discussed.