一、工程简介葛洲坝水利枢纽位于长江三峡出口南津关下游3公里处,是计划兴建的三峡的组成部分之一。枢纽包括总泄量为11万立方米/秒的一座泄水闸和两座冲砂闸、两座可通过万吨级船队的船闸和一座通过三千吨级船队的船闸及总装机容量为271.5万千瓦的两座发电厂。坝轴线总长2592米。葛洲坝枢纽是径流式电站,控制流域面积100万平方公里,坝基软弱夹层是工程的主要
First, the project profile Gezhouba Dam is located in the Three Gorges exit of the Yangtze River 3 kilometers downstream of the Nanjinguan, is planning to build one of the Three Gorges. The hub includes a sluice with a total discharge of 110,000 cubic meters per second and two flush gates, two of which are accessible by a 10,000-tonnage ship’s lock and a three-tonne class ship’s lock with a total installed capacity of 2.715 million kilowatts of two power plants. Dam axis total length of 2592 meters. Gezhouba Dam is a runoff power station, control the drainage area of 1000000 square kilometers, the dam foundation soft interlayer is the main project