【摘 要】
:
介绍东圳水电站长引水管道无井无阀调保试验成果。经调保计算和调保试验,证明在原有水轮机调速器上,可通过调整关闭时间、加装导叶分段关闭装置,使东圳水电站库水位从69m提高
【机 构】
:
东圳水电站,东圳水电站 福建莆田 351100,福建莆田 351100
论文部分内容阅读
介绍东圳水电站长引水管道无井无阀调保试验成果。经调保计算和调保试验,证明在原有水轮机调速器上,可通过调整关闭时间、加装导叶分段关闭装置,使东圳水电站库水位从69m提高到正常水位80.5m,三台机组同时甩负荷时机组无异常现象出现,从而取消了电站的调压井或调压阀,节省了费用。
Introduction Dongjiang Hydropower Station long diversion pipe without valve without adjustment test results. The adjustment of the calculation and adjustment of security test proved that in the original turbine governor, can be adjusted by closing time, the installation of guide vane section closing device, so that the water level of Dongzhen Hydropower Station from 69m to normal water level 80.5m, three Unit at the same time load rejection unit no abnormal phenomenon, thus eliminating the surge tank or pressure regulator valve, saving costs.
其他文献
采用文献资料法、调查法 ,对 30 0 0m跑多次训练的概念、必要性、生理学基础等进行较为详细的论述 ;多次训练计划的安排应突破传统的条条框框 ,在全天 2 4h内合理安排 ,实践
To study the formation of layer shaped pores in TiC Fe cermet, two Ti C Fe powder compacts containing Ti powders with two size ranges (< 44μm and 135~ 1
随着体育事业的不断发展,运动员的营养越来越受到人们的重视。合理的营养对运动员来说,是提高一定成绩,取得良好训练效果的物质保证。然而应如何对运动员的营养进行管理成为
在利用地表水、极浅层水,作为水源的人畜吃水以及其它管道引水工程中,一直沿用截流作为集水形式。但常常带来3个问题:一是水源互程规模大、投资多、施互复杂;二是浅层截流,
基于机械剥离方法,即通过胶带反复剥离高定向热解石墨,制备得到少层石墨烯,并将其作为可饱和吸收体实现了被动谐波锁模掺铒光纤激光器。在抽运功率约135 m W时,获得了中心波
1995年10月中国石化上海金山实业公司会同浙江省河口海岸研究所,对石化前沿海域滩槽进行了调查,并作了动态分析研究。杭州湾是一典型的喇叭型海湾,外海潮波进入杭州湾后,受
今年,丰县对已建417座固定泵站实行分级管理,明确权、责、利,贯彻“谁受益、谁管理、谁负担”的原则。其中,县管的11座站,装机45台、5880kW,春节前进行普查,制订维修计划,经
为解决粒子滤波算法中存在的权值退化和实时性差的问题,提出了一种改进的权值优化组合粒子滤波算法(impWOPF),该算法通过对粒子权值设定门限Thershold,剔除权重小于Thershold
北方平原贮灰场由于冬天运行水位高、冰冻,春天又多风浪浸蚀,因此常出现“春险”。针对“春险”成因,采取尽量降低排水井最下一层排水口高程和回水泵吸水口高程;结合主导风向
人体解剖学是高职临床专业学生必修的一门重要的医学基础课程,它为进一步学习后续的医学基础课程和临床医学课程奠定基础。本文分析了在高职临床专业学生中创建解剖兴趣小组