图1是利用盐矿层建造人工地下贮气库时排盐设备流程。 将井钻到盐层后,把各种管道安装至井下。由工作泵将淡水通过内管1压到岩盐层。饱和盐水从管1和管2之间的管腔排
Figure 1 is the use of salt seam artificial underground gas storage tank when the flow of equipment. After the well is drilled into the salt, various pipes are installed downhole. Fresh water is pumped by the working pump through the inner tube 1 to the rock salt layer. Saturated saline drains from the lumen between tube 1 and tube 2